Granny flat rules in NSW: what can you build without a DA?
By Anthony Simon. Last reviewed 23 November 2026. 5 minute read.
In NSW you can build a granny flat without a development application if it ticks every box in the state rules. You still need an approval, called a complying development certificate (CDC). The main tests are a lot (land size) of at least 450 square metres, a granny flat of no more than 60 square metres, and only one house and one granny flat on the lot. If the design misses any standard, it goes to council as a DA.
Key points
"No DA" does not mean no approval. The fast path is a complying development certificate, issued by council or an accredited certifier.
The lot must be at least 450 square metres, unless the granny flat is entirely inside the existing house.
The granny flat can be up to 60 square metres, or larger if the local council plan allows it.
The lot ends up with one main house and one granny flat. The lot cannot be subdivided.
No extra parking is required under the State policy.
NSW Planning says a complying development approval can be issued in as little as 20 days.
Many people are hearing "no DA" and thinking that means no approval. It doesn't. You still need a certificate, and every standard has to be met, not most of them.
Anthony Simon
Fast path or DA
Can use the fast path | Goes to council as a DA |
|---|---|
Lot of at least 450 square metres | Lot under 450 square metres, unless the granny flat is inside the existing house |
Granny flat of 60 square metres or less | A design that misses any one of the standards |
One main house and one granny flat on the lot | More than two dwellings on the lot |
Residential zones R1, R2, R3, R4 and R5 | Other zones, where the council plan decides |
What the rule says
Granny flats are called secondary dwellings in the rules. They are covered by the State Environmental Planning Policy (Housing) 2021, known as the Housing SEPP. NSW Planning's secondary dwellings page explains the policy, and the standards themselves are in Schedule 1 of the Housing SEPP.
The state sets one list of standards. Tick every box and a certifier can approve it. Miss one and it goes to council as a DA, which NSW Planning says takes about 70 days on average.
The main numbers
These are from Schedule 1 of the Housing SEPP for a lot between 450 and 900 square metres. Larger lots have different figures.
Frontage: at least 12 metres to the street, measured at the building line.
Site coverage: the house, granny flat and other structures together cover no more than 50 per cent of the lot.
Total floor area: house and granny flat together no more than 330 square metres on a lot up to 600 square metres, or 380 square metres on a lot up to 900 square metres.
Height: no more than 8.5 metres.
Side setback: at least 0.9 metres, and more once the building is higher than 3.8 metres.
Rear setback: at least 3 metres, and more once the building is higher than 3.8 metres.
A battle-axe lot has its own access rules. Privacy, windows facing the street and landscaping have their own standards as well.
What's changing
The NSW Government has proposed a change that could help here. Right now, if a design misses one standard, even by a little, it's out of the fast path. Under the proposal, council could approve a small variation, for things like setbacks, height, floor area or driveway access, and the project would stay on the CDC path. Up to three or four standards could be varied on one project.
It's a proposal, not law yet. It was on exhibition from 14 May to 24 June 2026, and NSW Planning was still considering the feedback when I checked on 23 November 2026. The first stage covers the housing codes in the Codes SEPP. Granny flats are approved under the Housing SEPP, which isn't named in that first stage, so it's not clear yet whether granny flats will be included. You can read the proposal on the NSW Planning Portal. I'll update this article when it's decided.
A granny flat on the same title as the house also matters for tax. I cover that in Does a granny flat or duplex count as a new build under the negative gearing changes?
What I've done on my own deals is check the lot size and the street frontage before anything else. If the block misses either one, the fast path is gone and I'm looking at a different deal.
Anthony Simon
What to ask your planner or certifier
Does my lot meet the size and frontage tests for a complying development certificate?
Is anything about my land ruled out of the fast path, such as bushfire, flood or heritage?
Does my council plan allow a granny flat larger than 60 square metres?
Does an existing approval on my property require parking that the granny flat would remove?
If my design misses one standard, is it better to change the design or lodge a DA?
Questions people ask
Can I build a granny flat in NSW without council approval?
You can build one without a development application if it meets every standard in the Housing SEPP. You still need a complying development certificate from council or an accredited certifier.
How big can a granny flat be in NSW?
Up to 60 square metres under the State policy, or larger if the local council plan allows a larger secondary dwelling.
What is the minimum lot size for a granny flat in NSW?
450 square metres for the fast path, unless the granny flat is entirely within the existing house. Smaller lots need a DA.
Can I subdivide and sell the granny flat?
Not under this path. The Housing SEPP says the lot cannot be subdivided.
Do I need extra parking for a granny flat?
The Housing SEPP does not require additional parking. NSW Planning says to check any existing approval on the property.
How long does approval take?
NSW Planning says a complying development approval can be issued in as little as 20 days, compared with an average of about 70 days for a DA.
Anthony Simon is a Sydney property investor and the founder of Real Estate Mentor Club. About Anthony
Watch the free session, The $100,000 Decision. Start here
General education only. This article is not financial, tax, legal, credit or planning advice. Planning rules depend on your land and your council, so speak to a town planner or certifier before acting.
Sources
NSW Planning: Secondary dwellings (page last updated 17 July 2025, checked 13 November 2026)
State Environmental Planning Policy (Housing) 2021, Schedule 1 (in force version, checked 13 November 2026)
NSW Planning: Complying development (page last updated 26 June 2026, checked 13 November 2026)
NSW Planning Portal: Variations and changes to complying development (exhibited 14 May to 24 June 2026, under consideration, checked 23 November 2026)